Whiting Beach Road - Stormwater and roadworks

Monday 23 September – Friday 29 November 2013 Completed


 Ozpave will be commencing works at Whiting Beach Road between the entrance to Taronga Zoo and the junction with Major Street on Monday September 23, 2013 weather permitting. The works at this stage include the upgrade of the stormwater facilities and the resurfacing of the temporary reinstatement along this section of Whiting Beach Road. To facilitate these works, traffic control will be in effect from Monday 23 September 2013. Some on-street parking will be unavailable during the works. Please ensure that your vehicles are NOT parked within the works area for the duration of works.

If you require a parking permit or have any other special requirements please contact Margarita Gonzalez Borrero 99784051.

Posted 2013-09-20 · Last modified 2013-11-01 · Works: Stormwater & Drainage Works: Roads, Traffic & Cycling Paths · Share Facebook Twitter Email